Rapid construction of lift and stair cores
- Construct one storey per day
 - Provides complete building stability
 - Costs similar to that of traditional RC cores
 - Offsite manufactured for accurate on-site construction
 

| Components (external view) | Concrete filling (internal view)  | 
  
Site Benefits 
- 5 to 20 stories
 - JIT delivery: No site storage required
 - Minimal crane hook time: position and release (circa 1 hour)
 - Openings preformed: pre-boarded for safety
 - No propping: panels are self-locating and self-stable in the temporary condition
 - No scaffolding: Installation entirely from crane and built-in platform
 - No carpenters or steel fixers required & … Erection and concrete fill by Verteka
 - Improved HSE: reduced work at height
 
- Structural frame: steel inserts pre-installed to accept building frame, stairs etc
 - Decorative finish: immediately paint, plaster or attach cladding
 - E&M: first fix items such as conduits and lift components can be immediately fixed
 - Frame: steel or concrete frame, LGS and modular pods all interface with Verteka PSF
 
BS EN Compliance    
- Part B: 2 Hour fire rating
 - Part E: exceeds 415 kG/m2 requirement
 - Certification: in progress with UK test houses
 